LiveChat

Follow us

This website requires cookies to provide all of its features. By using our website, you agree to our use of cookies - Learn morex

Our phone lines are extremely busy, if you are unable to get through please use our email info@cladco.co.uk. For delivery information, please click here

Please see documentation of measures taken to reduce the risk of COVID19 here

 

Order a sample

Receive a sample before you buy

 

Decking calculator

How much decking will I need?

 

Decking guide

How to measure your area

 

4-5 Week delivery

Click here for delivery information

Timber joist Type A, Use Class 2 Green treated batten 50mm x25mm, 4.2m long

In stock
SKU
TIM502542
£4.50
New Type A Use Class 2 timber 50mm x 25mm green treated FSC Certified timber joists in a handy 4.2m length. These timber joists can be used in conjunction with our timber posts, you will be able to create a structurally stable base that lasts. These timber decking joists are treated with Tanalith ‘E’ preservative to ensure long-lasting protection from the elements.

Need help? Call Us on: 01837 659901

Monday to Friday 8am to 5pm, and Saturday 8am to 12.30pm.

The Benefit of using our Timber Decking Joists

New Type A Use Class 2 timber 50mm x 25mm green treated FSC Certified timber joists in a handy 4.2m length. These timber joists can be used in conjunction with our timber posts, you will be able to create a structurally stable base that lasts. These timber decking joists are treated with Tanalith ‘E’ preservative to ensure long-lasting protection from the elements.

Joist Length: 4.2m

Joist Width: 50mm

Joist Depth: 25mm

Each joist weighs approximately 2.5 kgs

These 4.2m timber joists can be used for a decking project or for some roofing projects as the purlin support system.


Timber Joists for a variety of projects

To see how to install these timber joists please visit our Installation Page  to find out more. Timber joists are an affective solution to decking projects that need to be raised off of the ground. Ensure the ground has been effectively cleared and use a weed mat to prevent weeds penetrating the area.